0
登录后你可以
  • 下载海量资料
  • 学习在线课程
  • 观看技术视频
  • 写文章/发帖/加入社区
创作中心
发布
  • 发文章

  • 发资料

  • 发帖

  • 提问

  • 发视频

创作活动
NCP1239B65WGEVB

NCP1239B65WGEVB

  • 厂商:

    ONSEMI(安森美)

  • 封装:

    -

  • 描述:

    EVALBOARDNCP1239B65WG

  • 数据手册
  • 价格&库存
NCP1239B65WGEVB 数据手册
Test Procedure for the NCP1239B65WGEVB Evaluation Board Introduction: Equipment Required: 1. An ac source (85 to 265 V rms, 60 / 50 Hz), needed power is below 100 W. 2. An input ac watt-meter, up to 100 W. 3. A dc load absorbing up to 50 V, Vin(max) < 30 V, Iout(max) < 5 A. Usually, dc electronic load can display dc V and dc A. If not, a voltmeter and ammeter will be needed. If the load does not use local Kelvin sensors, then the output voltage must be measured at the board level, not at the cable ends. Setup Procedure: 3/10/2014 1 www.onsemi.com Test Procedure: ******WARNING – Dissipate large 400V capacitor on isolated side of the board (power-in side) before handling after completing the test procedure.******* Test 1 – No Load Standby 1. Apply the input voltage 115 V rms to J1 connector 2. The LED connector is removed 3. Electronic load is disconnected or set to no load 4. Check that output voltage is 19 V (±5%) 5. Verify that input power is below 45 mW 6. Apply the input voltage to 230 V rms 7. Repeat above steps 8. Input power must be below 55 mW Test 2 – Nominal Power 1. Apply the input voltage 115 V rms to J1 connector 2. The LED connector is in place 3. Connect electronic load to J2 connector 4. Load is set to 3.4 A 5. Check that output voltage is 19 V (±5%) 6. Verify that input power is: 70 W < Pin < 75 W 7. Apply the input voltage to 265 V rms 8. Repeat above steps Test 3 – Maximum Power 1. Apply the input voltage 115 V rms to J1 connector 2. The LED connector is in place 3. Connect electronic load to J2 connector 4. Load is increased over nominal current (3.4 A) 5. At a certain point, Iout(max), Vout collapses and the converter enters in auto-recovery mode (typical is 4.4 A) 6. Maximum output current is: 3.9 A < Iout(max) < 4.5 A 7. Apply the input voltage to 265 V rms 8. Repeat above steps 9. Iout(max) is now typically 4.1 A Test 4 – Short-Circuit 1. Apply the input voltage 115 V rms to J1 connector 2. The LED connector is in place 3. Short-circuit is applied at the output via the electronic load for instance 4. Load is increased over nominal current (3.4 A) 5. Vout must collapse and the converter enters in auto-recovery mode 6. Verify that average input power is below 3 W 7. Apply the input voltage to 265 V rms 8. Repeat above steps End of Test. 3/10/2014 2 www.onsemi.com
NCP1239B65WGEVB 价格&库存

很抱歉,暂时无法提供与“NCP1239B65WGEVB”相匹配的价格&库存,您可以联系我们找货

免费人工找货